/* Mobile Menu Retract ---------------------------------*/

BULLY OPENING – LOAD OUT SHIFT

9:15pm to 10:00pm: LOAD-OUT for BULLY OPENING. Report to front of theatre and be prepared to assist with clearing out all set pieces once the show is over.  Help load set pieces into vehicles and/or transport materials to storage area. Shift begins 15 minutes before performance ends and ends about 30 minutes after performance ends.