/* Mobile Menu Retract ---------------------------------*/

BULLY PREVIEW 2 – LOAD OUT SHIFT

12:15pm to 1:00pm: LOAD-OUT for BULLY - PREVIEW #2. Report to front of theatre and be prepared to assist with clearing out all set pieces once the show is over.  Help load set pieces into vehicles and/or transport materials to storage area. Shift begins 15 minutes before performance ends and ends about 30 minutes after performance ends.